Pricing, MOQ and commercial terms
Outdoor Clothing Pricing and MOQ: How a Custom Jacket Is Actually Quoted
The full commercial picture of a custom outdoor clothing programme — per-piece cost structure, MOQ bands, sample fees, trade terms and payment — with every number we publish and stand behind.
Quick Answer: A custom jacket is quoted per piece as fabric + trims + labour + printing/embroidery + quality inspection + packaging + factory-side logistics. Our MOQ is 300–500 pieces per style and colour for basic constructions and 500–1,000 for functional styles (waterproof, insulated, flame-retardant). Samples take 7–14 working days at a refundable fee (3–5 days when stock fabric is used); bulk production runs 30–50 days for simple styles. Quotes are issued FOB by default in USD or EUR, with T/T (deposit + balance) as the standard payment structure.
Related guides: full purchasing guide · factory verification guide · fabric specification library
How is a jacket quoted per piece, and what is not included?
Every line is itemised, so you can see where the money goes and negotiate on facts rather than a single opaque number.
| Cost line | What drives it | Rule of thumb |
|---|---|---|
| Fabric | Weight (gsm), membrane layer count (2L/2.5L/3L), custom vs stock weave | The largest single share of a shell garment's cost |
| Trims and accessories | Zips, drawcords, snaps, seam tape, labels | Functional trims on outdoor styles add real money per unit |
| Labour | Construction complexity, seam count, taping coverage | Rises with every seam that must be taped or reinforced |
| Printing / embroidery | Logo count, stitch density, placement | Quoted per position and per technique |
| Quality inspection | In-line checks, AQL final inspection, testing coordination | Built into the unit price, not billed later |
| Packaging | Polybag, hangtag, carton, custom retail packaging | Custom packaging quoted as a separate line |
| Factory-side logistics | Transport to port, export documentation | Included up to the agreed trade term |
Usually NOT included in the unit price
International freight and insurance, import duties and taxes in your market, third-party lab testing fees, and brand royalties. Sample fees are separate but refundable against the bulk order at UniOuter.
One rule that prevents quote chaos
Always confirm which trade term sits behind the number — EXW, FOB, CIF or DDP. Comparing an FOB quote against a DDP quote is meaningless; budget the excluded items separately before negotiating unit price.
What is a realistic MOQ for custom outdoor clothing?
Published bands, not moving targets. The floor rises with construction complexity because set-up cost is real.
| Programme type | MOQ band | Why |
|---|---|---|
| Basic styles, stock fabrics | 300–500 pcs / style / colour | Standard constructions on fabrics we hold in safety stock |
| Functional styles | 500–1,000 pcs / style / colour | Waterproof, insulated or flame-retardant builds add special trims and processes |
| Custom-woven or custom-dyed fabric | Higher, set by the mill | The fabric mill carries its own production minimum |
| Long-term partners, multi-style programmes | Negotiable | Adjusted for programme size and repeat history |
Lower the entry barrier
Stock fabrics accept smaller runs; multiple colours of one style can combine into a single production batch to reach the minimum efficiently.
Test before committing
Small mixed and repeat orders are supported for new-item testing and refined cross-border selling.
A warning on quotes far below these bands
They usually mean stock-fabric "customisation" — a logo on an existing blank — not a true custom build to your tech pack.
What do samples cost and how fast are they made?
Nothing about the product is left to assumption: physical samples are cut and sewn from your tech pack, sketch or reference garment.
| Sample route | Lead time | Cost basis |
|---|---|---|
| Standard development | 7–14 working days | The published site-wide standard timeline |
| Rush service | 7–10 working days | Defined surcharge, not a vague promise |
| Stock fabric, existing pattern | 3–5 working days | Fastest and cheapest route when fabric is in stock |
| New pattern / custom print / special fabric | Quoted per case | Carries a development fee |
Refund policy
The sample fee is refundable or deducted from the bulk order once the order is confirmed — serious buyers effectively sample for free.
What you receive
The physical sample plus measurement sheet and construction notes, so the approved sample can genuinely be reproduced in bulk.
How long does production take for 500 jackets?
Counted from sample confirmation, because a mid-production change resets the clock.
| Programme | Bulk timeline | Where the time goes |
|---|---|---|
| Simple styles, in-stock fabrics | 30–50 working days | Fabric prep 7–20 days, then cutting, sewing, taping, finishing, inspection, packing |
| Complex styles or custom-woven fabric | 60–90 working days | Mill must weave and dye to order before cutting starts |
Scheduling tip 1
Lock the sealed sample before bulk starts — changes after cutting has begun reset the whole timeline and add cost.
Scheduling tip 2
If your launch date is fixed, ask for a milestone plan with fabric-booking and cut dates visible. An expedited lane exists at a defined surcharge.
FOB, CIF or DDP — which trade term should you use?
Trade terms decide who books freight, who carries risk in transit and who clears customs. They move real money, so match them to your experience.
| Term | What we handle | What you handle | Best for |
|---|---|---|---|
| FOB (default) | Goods cleared onto the vessel | Main freight, insurance, import clearance | Experienced importers who control freight cost and consolidate suppliers |
| CIF | Fright and insurance to your port | Import clearance, duties, inland delivery | Occasional shipments where convenience beats rate control |
| DDP | Transport, insurance, duties, clearance to your door | Receiving only | First-time importers trading simplicity for a higher unit price |
| EXW | Goods ready at our factory | Everything from pick-up onward | Buyers with their own China-side forwarder |
The landed-cost formula to run before comparing factories
Landed cost = FOB unit price + freight + cargo insurance + import duty + customs clearance + inland transport + testing and compliance
Two quotes with a 10% FOB gap can invert once duty and logistics are added. Duty depends on HS classification and fabric composition — check the exact category before you anchor on unit price. Sea freight to Europe runs roughly 30–40 days and to the US West Coast 15–25 days; air freight multiplies cost, so plan by order size.
What payment methods does a custom programme use?
Terms are confirmed in writing on the proforma invoice before production starts — no surprises mid-run.
T/T bank transfer
The standard structure: deposit at order confirmation, balance settled before shipment. Ratios flex with order size and relationship history.
L/C at sight
Letter of credit through your bank — bank-level security for larger orders and new relationships.
Negotiated terms
Long-term and repeat clients discuss flexible schedules based on volume and payment history. Quotes are issued in USD or EUR.
Why do suppliers refuse to quote before seeing a tech pack?
Because price is driven by fabric weight and composition, trim count and construction complexity. A complete tech pack gets a firm, holdable number; a photo only gets a range that will move.
No tech pack yet? We build one from a reference sample and a measurement chart, for a defined development fee — ask for it in your customisation enquiry.
Frequently Asked Questions
Can colours be combined to reach the MOQ?
Yes — multiple colours of the same style can often be combined into a single production run, which is the most common way new brands reach the minimum efficiently.
Is the sample fee really refundable?
The fee is refunded or deducted from the bulk order once production is confirmed. New-pattern developments and custom prints carry a development fee that is quoted before work starts.
Are third-party lab tests included in the price?
No. Third-party testing (for example SGS or Intertek reports) is billed at cost. We coordinate the sampling and hold our own in-house test records for every production batch.
Can UniOuter quote EXW if I have my own forwarder in China?
Yes. EXW is available alongside FOB, CIF and DDP. Tell us your forwarder's pick-up requirements and we prepare the goods and export documents accordingly.
What currency are quotations issued in?
USD or EUR as standard. Other currencies can be discussed for long-term programmes; the agreed currency and milestones are stated on the proforma invoice.
Get an itemised quote for your programme
Send your tech pack, sketch or reference sample — you receive a per-line quotation, MOQ options and a milestone plan, not a single opaque number.
About UniOuter: UniOuter (Zhejiang Hualilai Imp & Exp Co., Ltd.) is a B2B outdoor clothing manufacturer based in Hangzhou, China. Founded in 2005, we run one self-owned factory with 200+ workers, OEM/ODM programmes for 20+ export countries, and a published MOQ and pricing policy for hiking, hunting, fishing and urban outdoor apparel.






